您要查找的是不是:
- Loosen hose at VB, open TC #1 and bleed, retighten hose connection. 松开阀门B上的软管,开启测试旋塞1号并且排气,重新紧固软管连接。
- Open TC #4 and loosen hose at vent needle valve connection bleeding air from test kit. 开启测试旋塞4号,松开排气针形阀上的软管,从检测组件上排放空气。
- Close valve C. Open valve A, then open valve B 1.2 turn, loosen hose at test cock #4 to remove air. Retighten hose. 关闭阀门C。开启阀门A,然后将阀门B开启1.;2圈,松开测试旋塞4号上的软管排出空气。重新紧固软管。
- Close vent needle valve. Open needle valve "A" high side, then open needle valve "B" low side + turn, loosen hose at test cock No. 4 to remove air. Retighten hose. 关闭排气针形阀。开启针形阀“A”高端,然后开启针形阀“B”低端,松开测试旋塞4号上的软管排放空气。重新紧固软管。
- Close shutoff #1, then slowly loosen hose at test cock #3 until differential gauge rises to 2psi and retighten hose. 将关闭阀1号关闭,然后慢慢松开测试旋塞3号上的软管直到差压计上升2psi为止,重新紧固软管。
- Slowly loosen hose at test cock #2 until differential gauge rises to 2 pre-tighten hose. 慢慢松开测试旋塞2号上的软管直到差压计升到2为止。预先紧固软管。
- Close shutoff #1, and then slowly loosen hose at test cock #3 until differential gauge rises to 2psi and retighten hose. 关闭1号关闭阀,然后慢慢松开测试旋塞3号上的软管直到差压计升到2psi为止,重新紧固软管。如果差压计读数没有增加,则记录止回阀为紧。
- Close shutoff #1, then slowly loosen hose at test cock #3 until differential gauge rises to 2 psi and retighten hose.If the differential reading does not decrease, record check as tight. 注意:如果关闭阀2号泄漏过于严重,则对总成的第一和第二止回阀的上述检测将会无结果。
- Slowly loosen hose connection at TC#3 until differential gauge rises to about 2 PSI, then tighten. 慢慢松开连接在测试旋塞3号上的软管直到压差表上升到大约2PSI,然后紧固。
- Tighten bypass hose at test cock No.1, open test cock No.1. 紧固测试旋塞1号上的旁路软管,开启测试旋塞1号。
- Tighten bypass hose at test cock No. 1, open test cock No. 1. 紧固测试旋塞1号上的旁路软管,开启测试旋塞1号。
- Install bypass hose between VA and VB. Open VB and bleed air by loosening hose connection at VA. Tighten hose connection and close VB. 在VA和VB之间安装旁路软管。开启VB,松开连接在VA上的软管连接排放空气。紧固软管连接,并关闭VB。
- Close shutoff No. 1. Slowly loosen hose connection at TC# 2 until differential gauge rises to about 2 PSI then tighten. If the differential reading does not decrease record check valve as tight. 关闭1号关闭阀。慢慢松开连接在测试旋塞2号上的软管直到压差表上升到大约2PSI,然后紧固。如果压差读数没有降低,则记录止回阀为密封紧密。
- Install bypass hose between VA and TC #4. Open VA, then bleed air by loosening hose connection at TC #4. Tighten hose connection. Close VA. 在VA和测试旋塞4号之间安装旁路软管。开启VA,然后松开连接在测试旋塞4号上的软管排放空气。紧固软管连接。关闭VA。
- The fireman directed his hose at the flames. 消防队员将水龙头管对准火焰浇水。
- Open TC#3, needle valve "B ", and vent needle valve. 开启测试旋塞3号,针形阀“B”,和排气针形阀。
- Open TC#2 and needle valve "A", close needle valve "A" and TC #4. 开启测试旋塞2号和针形阀“A”,关闭针形阀“A”和测试旋塞4号。
- Engine: Connect the lower radiator hose at the water pump. 0公升引擎:于水泵处连接下侧散热器软管。
- Open TC #4 and flush test cocks Nos. 1, 2, and 3 on BF assembly, then close TC #4. 开启测试旋塞4号并冲刷BF总成上的测试旋塞1,2和3号,然后关闭测试旋塞4号。
- Connect vent hose loosely to test cock #1. Open valve A to vent air from the vent hose. Tighten vent hose at test cock #1, open test cock #1. 将排气软管松弛地连接到测试旋塞1号。开启阀门A从排气软管处排出空气。紧固测试旋塞1号上的排气软管,开启测试旋塞1号。